Scott Tallon Walker Architects has been appointed, together with a full design team, to the redevelopment of Dublin Port’s Headquarters, with the goal of upgrading the building to meet the EU 2050 Energy and Carbon Targets while also supporting the Dublin Port Authority’s 2030 and 2050 sustainability objectives. This sustainable, deep retrofit and reimagining of the six-storey concrete-frame commercial office building, including a lower ground floor, is located within Dublin Port’s conservation area.

 

Client
Dublin Port Company

Area
5110m²

Location
Dublin Port Centre, Alexandra Road, Dublin 1, D01 H4C6

LEED certification levels

LEED
Targeting LEED Platinum V4.1

Status
Under construction

 
 

Client  Dublin Port Company

Location  Dublin Port Centre, Alexandra Road, Dublin 1, D01 H4C6

Status  Under construction

Area  5110m²

LEED  Targeting LEED Platinum V4.1

Share   Twitter   LinkedIn   Facebook

 
Redevelopment of Dublin Port Headquarters

Artists’ impression of new external staff canteen garden area 

Client, Stakeholder, and End User Engagement

The building is recorded on the National Inventory of Architectural Heritage (NIAH), recognising it as the architectural focus point to Dublin Port and noting its technically innovative external concrete frame and full height glazing. Due to the historic nature of the project, Dublin City Council Conservation were consulted to review and agree our approach prior to lodgement of a Full Planning Application.

Extensive stakeholder engagement meetings took place with all departments of the building including the Dublin Port Heritage Department. The building is being reorganised to relocate departments and create a new canteen at the lower ground floor leading onto an external garden area. In collaboration with the Heritage Department, artifacts, historic maps and important memorabilia will be showcased throughout the building enabling staff and visitors to understand the rich history of the Port.

Architecture and Design Strategy

Originally designed by Scott Tallon Walker Architects in the late 1970’s and completed in 1981, the Dublin Port Company Headquarters has undergone little change since completion. The location and broad functionality of the building still work well for Dublin Port; however, thermally and from a weathering point of view the building requires upgrading.

The design strategy prioritises the retention and reuse of the existing structural frame, conserving embodied carbon and significantly reducing demolition-related emissions. The existing building’s glazed envelope will be replaced with a high-performance timber-framed aluminium façade, delivering substantial improvements in thermal performance, airtightness, and occupant comfort. Alterations to lower ground floor include new shared facilities, a canteen, larger meeting room, changing facilities, and gym. The office internal fit-out will be upgraded, with new partitions and ceilings.

The visual identity of the building, through its exposed concrete frame, created complex cold bridges which were technically challenging to overcome. Detailed modelling was carried out and bespoke details designed to maintain the original language of the building whilst eliminating any thermal conductivity or condensation.

Redevelopment of Dublin Port Headquarters

Impact for End Users and the Community

Beyond energy performance, the retrofit creates additional value for end-users through spatial enhancement. This includes increased floor area through an addition of a mezzanine level, a new external envelope enabling the full utilisation of the existing fifth floor, the addition of accessible roof terraces, a comprehensive redesign of the building cores to meet current regulatory standards and evolving client requirements, material choices and construction strategies focus on minimising whole-life carbon while prioritising occupant health, well-being, and long-term adaptability.

The new public plaza at Dublin Port Headquarters will enhance the public realm, and will form part of the Dublin Port Tolka Estuary Greenway, providing a corridor from the River Liffey to the Tolka estuary for pedestrians and cyclists. The Greenway will be a major active travel and public amenity, delivered by Dublin Port as part of its continued drive towards integrating the working port with the busy city centre.

Redevelopment of Dublin Port Headquarters

Artists’ impression of the proposed Dublin Port Tolka Estuary Greenway towards Dublin Port Headquarters 

Accessibility

The existing floor plates did not accommodate sanitary facilities. The core in the redeveloped design is being modified to include accessible WC’s on each level. Universal design principles have been applied to the design of the new interiors, including accessible kitchens, entrances, and reception areas.

Sustainability

As well as improved occupant comfort, a main project aim is improved energy efficiency and sustainability. This is being delivered through:

  • Upgraded building fabric and services to meet 2050 energy targets.
  • Insulation to all existing external envelope elements and glazed façade replacement, addressing thermal bridges.
  • Cleaning/ repairs and refurbishment of the expressed pre-cast concrete frame of the Brutalist building.
  • Design for added value in creation of new spaces.
  • Redesign of the cores to achieve compliance with current standards and client requirements.
  • Lowering the embodied carbon through design and choice of materials design for occupant’s health and well-being.
  • Essential repair works to fifth floor to improve insulation and resolve water ingress issues.
  • The existing gas-powered heating and cooking system is being replaced by heat pumps powered by photovoltaics.
  • Targeting LEED Platinum certification.